Call 1917 or 26594500/ 61564500

Mahanagar Gas

HomeCustomer ZoneCustomer CarePolicies & Procedures

Service Charges

After Sales Rate (Labour rates) for job inside the customer's premises effective from 15th May, 2017 (This service is available from 10 AM to 6 PM on all days except Sundays and Holidays)

  • Sr. No. Activity Description Unit Rate / unit
  • 1 Removal of Meter without alteration  Each 280
  • 2 Installation of Meter without alteration Each 400
  • 3 Addition / Alteration of Copper Tubing in addition to job done in SR No 2 Meter  65
  • 4 Addition / Alteration of GI Pipe   Meter  120
  • 5 Only Copper Pipe Work (upto 5 meter) Each  500
  • 6 Removal of Hole piece without alteration Each 350
  • 7 Installation of Hole piece without alteration Each 350
  • 8 Temporary Disconnection Each 200
  • 9 Reconnection (of Temporary Disconnected cases only) Each 225
  • 10 Fixing of PVC Clamps only Each 175
  • 11 Inspection of MGL installation. Each 250
  • 12 Meter replacement work  Each 400
  • 13 Visit charge applicable on second visit/ techical support request from customer/leakage in case of meter checking  Each 150
  • 14 Installation/replacement of appliance valve Each 200
  • 15 Installation/replacement of meter brackets Each 300
  • 16 Meter checking (In case if meter is found OK) Each 550
  • 17 Painting of GI riser & laterals. Meter 95
  • 18 Riser testing,leakage rectification & clamping of riser. Meter 50
  • 19 Shifting of Service regulator upto 3 meter Meter 3000
  • 20.a Laying of 32/63 mm PE pipeline without reinstatement Meter  500
  • 20.b Laying of 32/63 mm PE pipeline with reinstatement Meter 900
  • 21 Installation of welded riser  Meter  350
  • 22 Installation of Half round concrete guard - labour charges Each 150
  • 23 GI riser work upto 4 meters for customer connectivity upto MCV including presleeved hole piece Each 1200
  • 24 Replacement of Riser isolation valve Each 250
  • 1. CGST & SGST will be applicable extra.
    2. 10% extra charges will be applicable on labour charges for M/s. Aarti Enterprises and D.G. Enterprises.

Material Charges

  • Sr. No. Item Description Unit Rate/Unit
  • 1 Copper pipe (including fittings & consumables) Meter  216.2
  • 2 GI pipe  (including fittings & consumables) Meter  188
  • 3 Brass Meter inlet/ outlet union (3/4"X3/4", 3/4"X12 mm) Each  123.14
  • 4 Brass disconnection union (1/2"X12mm,3/4"X12mm) Each  102.46
  • 5 1/4" Valve (Appliance Valve+Brass Adapter) Each  153.97
  • 6 1/2" Valve (MCV) Each  187.705
  • 7 Presleeved Hole Piece  Each  62.98
  • 8 Meter Bracket  Each  43.24
  • 9 Aluminium saddle (clamp) with SS screw  Each 9
  • 10 Half round concrete guard Each 129.75

1. The above material charges may subject to change as per revised material rates received from MGL stores from time to time.
2. any other material rates not mentioned above shall be refered from MGL approved rate list provided by MGL AIC.
3. CGST & SGST will be applicable extra.

Gas Geyser Installation Rate

  • Sr. No. Activity UoM Present Rate / unit
  • Labour chrges for Gas geyser
  • 25.a Visit charges Each 150
  • 25.b Copper pipe work up to 5 mtr. Each 500
  • 25.c Copper pipe work above 5 mtr. (In addition to Sr. No. 2) Meter 65
  • 1. CGST & SGST will be applicable extra.
    2. 10% extra charges will be applicable on labour charges for M/s. Aarti Enterprises and D.G. Enterprises.

    Material Charges for Gas geyser
  • 11 Copper pipe (Including fittings & consumables) Meter 216.2
  • 12 1/4" Valve (Appliance Valve+Brass Adapter) Each 154
  • 13 Steel Braided Suraksha Rubber Tube Meter 107
  • 14 Gas Geyser cost Each Actual as per bill provided to customer
  • 1. The above material charges may subject to change as per revised material rates received from MGL stores from time to time.
    2. any other material rates not mentioned above shall be refered from MGL approved rate list provided by MGL AIC.
    3. CGST & SGST will be applicable extra.

Schedule of rates for attending stove burner and rubber tube requests

  • Sr. No. Activity Unit Amount (Rs.)
  • 1 Suraksha Tube (1.5 Mtrs.) Each 190
  • 2 Visit Charges Each 75
  • 3 Hot plate service charges Per hot plate 70
  • 4 Hot plate services
  • 4. a. Knob change Each 12
  • 4. b. Jet replacement Each 12
  • 4. c. Nut/ bolt/ screw Each 12
  • 4. d. Spring change Each 8
  • 4. e. Lock pin change Each 8
  • 4. f. Gas cock Each 180
  • 4. g. Small burner with brass top Each 170
  • 4. h. Big burner with brass top Each 215
  • 4. i. Side change Each 60
  • 4. j. Nipple Each 30
  • 4. k. Pan support (Cast iron) Each 90
  • 4. l. SS Burner tray Each 65
  • 4. m. Brass burner top (Small) Each 110
  • 4. n. Brass burner top (Big) Each 120
  • 4. o. Rubber legs Each 25
  • 4. p. PVC legs Each 25
  • 4. q. Clip charges Each 12
  • 4.r. Spindle Each 42
  • 4.s. Nozzle Each 110
  • 5. Cooking range and 4 burner services Per cooking range 300
  • 6. Stove conversion (LPG to PNG and PNG to LPG)
  • 6. a. Stove with 2 burners Per stove 150
  • 6. b. Stove with 3/ 4 burners Per stove 250
  • 6. c. Automatic stove* Per burner 100

Note : *Conversion charges are only for services, material charges required for conversion will vary as per stove make